Coombabah Sewage Treatment Plant Upgrade
Project Overview
The Coombabah Sewage Treatment Plant (CSTP), the Gold Coast’s largest facility, treats around 50% of the city’s wastewater. A condition review of Preliminary Treatment Facility A (PTF-A) identified the need for a new PTF-C to support increasing demand and ensure resilience. PTF-C was commissioned to boost capacity while PTF-A is taken offline for review. Once operational, PTF-B and PTF-C together will treat 500,000 EP at 4,000 L/s, ensuring long-term service continuity.
- Client Acciona AU & NZ
- Location Gold Coast, QLD
Scope of Works
CV was appointed to support the expansion of CSTP’s preliminary treatment infrastructure, integrating new utilities with minimal disruption.
Key deliverables:
- Construction of PTF-C with inlet chamber, screening, grit removal, odour control, and interconnection to existing infrastructure.
- Reinstatement of Storm Overflow Lagoon return line.
- Utilities upgrades: potable and service water, compressed air, and fire protection.
- Installation of low voltage electrical systems.
- Integration of SCADA and control systems for remote management.
- Finalisation of civil works including pit and pipe installation.
The CV Difference
Client Feedback
“I wanted to take the opportunity to express my appreciation for the excellent work the CV Industrial team delivered on the project.
CV’s professionalism and dedication to high quality electrical install while maintaining an open and collaborative approach, helped contribute to the success of the project.”
– Commissioning Manager, Acciona AU & NZ