Brisbane Airport – Dryandra Road Underpass
Project Overview
The Dryandra Road Underpass formed a critical component of Brisbane Airport’s major expansion program, supporting the delivery of the new parallel runway and associated airside infrastructure. Located beneath the future aircraft taxiway, the underpass provides a vital transport link between the Domestic Terminal and the airport’s northern precinct while enabling aircraft to taxi safely overhead.
CV delivered the electrical and communications infrastructure required to support the operation, safety and reliability of this strategically important asset. The project demanded robust, high-performance systems capable of operating within one of Australia’s busiest aviation environments and supporting infrastructure designed to withstand aircraft loads of up to 710 tonnes.
- Industry Airports
- Client McConnell Dowell
- Location Brisbane Airport, QLD
Scope of Works
CV delivered the design, installation and commissioning of essential electrical, communications, lighting and security infrastructure throughout the underpass and surrounding road network, ensuring safe and reliable operation of the facility.
Key deliverables:
- Design and installation of more than 500 street lighting control systems and luminaires.
- Delivery of works across 55,000 project man-hours.
Outcomes & Impact
The CV Difference
CV understands the unique operational, safety and compliance requirements of airport and road infrastructure environments, delivering complex projects within live transport networks where reliability, stakeholder coordination and uninterrupted operations are critical. With extensive experience across aviation, transport and major infrastructure sectors, CV provides clients with the confidence of a proven delivery partner capable of executing large-scale, technically complex projects safely, efficiently and to the highest quality standards.