CV delivered the building, electrical and signage works for the State of Origin Walk of Fame at Suncorp Stadium. The project required the coordinated delivery of multiple trades within an operational stadium environment, from initial groundwork and concrete works through to electrical services and signage installation. Careful programming and communication between CV’s teams ensured works were completed safely, on schedule and without disruption to stadium operations. The completed installation provides a permanent recognition of players who have contributed to Queensland’s State of Origin history.

  • Industry Entertainment Venues
  • Client Suncorp Stadium
  • Location Milton, QLD

Scope of Works

CV’s Building, Electrical and Signage teams worked under a coordinated delivery approach, providing continuity across each stage of the project. Signage was designed and manufactured in-house at CV’s Hendra facility before being installed on site by the project team.

Key deliverables:

  • Site preparation and groundwork
  • Placement of more than 40m³ of concrete
  • Associated electrical works
  • Design and production of project signage
  • In-house signage manufacture at CV’s Hendra facility
  • Graphic production and finishing
  • On-site signage installation
  • Coordination of multiple trades within an operational public venue
  • Programming of works to maintain stadium operations throughout delivery

Outcomes & Impact

  • Integrated delivery – Building, Electrical and Signage teams were coordinated across the project, supporting an efficient transition between each stage of works.
  • Operational continuity – Works were planned and delivered without disruption to Suncorp Stadium operations.
  • Quality control – In-house signage design and manufacture provided greater control over quality and consistency through production and installation.
  • Safe execution – Detailed planning and trade coordination supported safe delivery within an active public environment.
  • Program performance – The works were completed on schedule through structured planning, sequencing and communication between project teams.
  • Long-term outcome – The completed Walk of Fame provides a permanent installation recognising Queensland’s State of Origin players and history.

The CV Difference

CV’s integrated service model enables complex, multi-disciplinary projects to be managed through a coordinated delivery framework, providing consistency from planning through to completion. Supported by in-house manufacturing capability, experienced trades and disciplined project management, CV delivers high-quality outcomes in operational and high-profile environments.