Brisbane Airport – New Parallel Runway

545a8174 Lr

Project Overview

The Brisbane Airport New Parallel Runway is one of Australia’s largest aviation infrastructure projects, delivering a major increase in airport capacity to support long-term regional growth and connectivity. With a project investment of $1.1 billion, the development included a new 3.3-kilometre runway, extensive taxiway networks, navigation systems, airfield infrastructure and a four-lane underpass. The runway opened in July 2020 and is expected to contribute an estimated $5 billion to the regional economy by 2035.

CV delivered critical electrical and communications infrastructure across the project, supporting the safe and reliable operation of key airport assets and transport infrastructure.

  • Industry Airports
  • Client SkyWay (Joint Venture between CPB Contractors and BMD Constructions)
  • Location Brisbane Airport, QLD

Scope of Works

CV delivered the supply and installation of essential electrical and communications infrastructure to support the operation of the new runway and associated facilities. The works encompassed power, communications, security and control systems across multiple project areas.

Key deliverables:

  • Supply and installation of ALER infrastructure.
  • Installation of communications equipment, switchboards, cable support systems, lighting and power services.
  • Installation of fire protection equipment, mechanical ventilation systems, UPS systems, generators and security infrastructure.
  • Installation of high voltage and communications cable networks.
  • Delivery of low voltage electrical distribution networks.
  • Installation of road lighting, communications and security networks.
  • Supply and installation of substations and field cabinets.

Outcomes & Impact

  • Enhanced Airport Capacity – Supported the successful delivery of infrastructure that enables increased aircraft movements and long-term airport growth.
  • Reliable Critical Infrastructure – Delivered integrated electrical, communications and security systems essential to airport operations.
  • Future-Ready Network Solutions – Installed scalable power and communications infrastructure to support ongoing operational demands.
  • Major Project Delivery – Contributed to one of Australia’s largest aviation construction projects through the successful delivery of complex infrastructure works.
  • Regional Economic Benefit – Supported a project expected to generate significant economic outcomes for South East Queensland through increased aviation capacity.

The CV Difference

Operating within active airport environments requires a specialist understanding of critical infrastructure, stringent safety requirements and the need for uninterrupted operations. CV has a proven track record delivering complex electrical and communications solutions for aviation projects, partnering with major contractors and stakeholders to provide reliable, compliant and future-ready infrastructure that supports safe operations and the successful delivery of significant airport developments.