Port of Brisbane – Curlew St LCC Design & Construct
Project Overview
Teys Australia, one of Australia’s largest beef processors and exporters to more than 60 countries, developed a new meat storage and distribution centre at the Port of Brisbane. To support the facility’s significant power requirements, CV delivered a turnkey Large Customer Connection (LCC) solution, including the design and construction of an Energex-compliant outdoor substation.
The substation was designed to provide 4.5MVA of power to the facility, enabling the HVAC systems to maintain the controlled warehouse temperature required for meat storage and export operations. Working closely with Energex, the Port of Brisbane and the project delivery team, CV successfully coordinated the connection of the new infrastructure to the Port’s electrical network while meeting critical programme milestones ahead of the Christmas period.
- Industry Ports
- Client Port of Brisbane
- Location Port of Brisbane, QLD
Scope of Works
CV delivered a complete design, construction, testing and commissioning package for the new outdoor substation and associated electrical infrastructure, ensuring reliable power supply to the facility’s critical operations.
Key deliverables:
- Completion of the substation Environmental Management Plan and Energex compliance requirements.
- Site acceptance testing, commissioning support and integration with the wider Port electrical network.
Outcomes & Impact
The CV Difference
CV has extensive experience delivering critical infrastructure within active port and logistics environments, where stakeholder coordination, utility interfaces and programme certainty are essential to project success. By working collaboratively with network providers, port authorities and principal contractors, CV consistently delivers reliable, compliant and future-ready infrastructure that supports long-term operational performance in complex industrial settings, helping clients bring critical facilities online safely, efficiently and on schedule.