Port of Brisbane – Pinkenba Wharf Fire System Upgrade
Project Overview
CV successfully delivered a major fire system upgrade for the Port of Brisbane at the Pinkenba Common User Berth, enhancing the facility’s firefighting capability while supporting increased bulk fuel import capacity. As principal contractor, CV coordinated a multidisciplinary team across engineering, project management, building, plumbing, electrical and fire services to deliver a comprehensive solution that strengthened safety, operational resilience and compliance across the wharf. Throughout the project, the berth remained fully operational, with works carefully planned and executed to minimise disruption to port activities.
- Client Port of Brisbane
- Location Pinkenba, QLD
Scope of Works
CV provided end-to-end design coordination, construction management and commissioning services for the wharf’s upgraded fire protection infrastructure. The project delivered a high-capacity, remotely operated firefighting system designed to provide rapid response capability across critical operational areas.
Key deliverables:
- Construction of a 4 metre high, 24 metre long fire barrier capable of withstanding extreme heat exposure for up to two hours.
- Installation of water oscillating hydrant monitors delivering 1,800 litres per minute at 7 bar pressure.