Urraween Pump Station Centralised Control Upgrade
Project Overview
In response to growing infrastructure demands and aging legacy systems, a strategic water bypass and booster pump station was developed on the existing reservoir site. This project not only introduced critical new infrastructure but also delivered essential upgrades to the existing pump station to enhance system reliability and scalability across the network.
- Industry Water & Wastewater
- Client Fraser Coast Regional Council
- Location Hervey Bay, QLD
Scope of Works
CV was engaged to lead the renewal and centralisation of electrical and controls infrastructure across the site. The key objective was to integrate and modernise operational control across both existing and new assets, streamlining operations and improving system resilience.