Factory Acceptance Testing Delivered with Metroid
Another Factory Acceptance Test (FAT) wrapped up at our head office facility, delivered alongside Metroid Electrical Engineering as part of an ongoing switchboard project.
These aren’t just a box-ticking exercise – it’s where the full build gets put through its paces and everything is checked, challenged and confirmed before it heads to site. It’s about making sure what has been designed and built actually performs the way it’s meant to, under real conditions.
A lot of effort goes into getting to this point. From the initial build through to final testing, it takes coordination across the team to get it right – and that’s what makes these milestones worth calling out.
A solid outcome all round – great to be working alongside the team at Metroid.