Subscribe!
close-icon

SUBSCRIBE TO OUR MAILING LIST

Our Work

Field of Dreams – Process & Packaging Infrastructure

6

Project Overview

CV played an integral role in the delivery of the landmark Suntory Oceania Field of Dreams facility, a transformative manufacturing development established through the $3 billion partnership between Frucor Suntory and Beam Suntory. Designed to produce up to 20 million cases of alcoholic and non-alcoholic beverages annually, the facility represents one of the most advanced beverage production sites in the region.

Working directly with global technology leaders Krones and GEA, CV delivered critical electrical, control, instrumentation and industrial communications infrastructure across both the processing and packaging areas of the development. This integrated delivery approach ensured seamless connectivity between production systems, utilities and automated manufacturing equipment throughout the facility.

  • Industry Food & Beverage Processing
  • Client Krones and GEA
  • Location Swanbank, QLD

Scope of Works

CV provided comprehensive electrical, control and instrumentation installation services supporting the facility’s core production, processing and packaging operations. The works encompassed multiple specialist systems and included both process and packaging infrastructure across the site.

Key deliverables:

  • Electrical, control and instrumentation installation for major beverage bottling and canning production lines.
  • Installation works supporting palletiser and depalletiser systems.
  • Electrical installation and cabling of IO Masters and associated field devices.
  • Instrumentation, valve and equipment cabling across process plant areas.
  • Electrical works for filtered water and carbon filter water treatment systems.
  • Infrastructure supporting CIP processes, filler systems and tanker unloading facilities.
  • Installation works within alcohol storage systems and hazardous area environments.
  • Electrical services for sugar silo, liquid sugar and alcohol IBC dosing systems.
  • Delivery of the site-wide PLC-SCADA fibre ring communications network.
  • Installation of site-wide equipotential bonding infrastructure.

Outcomes & Impact

  • Integrated Automation – Delivered seamless electrical, control and communications infrastructure across process and packaging operations.
  • Production Readiness – Enabled critical bottling, canning, packaging and process systems required for large-scale beverage manufacturing.
  • Enhanced Connectivity – Established a robust site-wide PLC-SCADA fibre network supporting operational visibility and plant-wide integration.
  • Specialised Capability – Successfully executed complex instrumentation and hazardous area works within a high-performance food and beverage environment.
  • Trusted Delivery Partner – Supported two global OEM suppliers on one of Australia’s most significant beverage manufacturing developments.

The CV Difference

CV brings together specialist electrical, instrumentation, automation and communications expertise to deliver complex industrial projects with certainty. Our ability to integrate seamlessly with global OEMs, manage diverse work fronts and maintain exceptional delivery standards continues to make CV a trusted partner for large-scale manufacturing and processing facilities.